Ir al contenido

Documat


Resumen de Engineering project management based on multiple regression equation and building information modelling technology

Chunli Xu, Mohammed Abdulrazzqa

  • To realise the optimisation of Building Information Modelling (BIM) technical engineering project management, the paperconducts data investigation and analysis of the technical problem which deals with a specific power grid tunnel construction.This article uses BIM to sample considerable data information for the construction and management of power grid tunnels.According to the geological factors of rock strength in construction, the fuzzy information fusion method is used to carryout the feature fusion and adaptive scheduling of management information. We will extract the characteristics of eachsurrounding rock category’s geological BIM information association rules and use the multiple regression analysis methodsto carry out the BIM information fusion and adaptive scheduling of the tunnel construction project management. The studyresults confirm the conclusion that the predicted scores are in good agreement with the geological scores on site.


Fundación Dialnet

Mi Documat