Santander, España
Oviedo, España
, Luis Castillo Vidal
, Juan Manuel Corchado Rodríguez
, Vol. 1, 2007, ISBN 978-84-611-8847-5, págs. 207-216We consider a job shop problem with uncertain durations and flexible due dates and introduce a multiobjective model based on lexicographical minimisation. To solve the resulting problem, a genetic algorithm and a decoding algorithm to generate possibly active schedules are considered. The multiobjective approach is tested on several problem instances, illustrating the potential of the proposed method.
© 2008-2026 Fundación Dialnet · Todos los derechos reservados