Round‑robin scheduling with regard to rest diferences
Tasbih Tufaha, Burak Çavdaroğlu, Tankut Atan
págs. 269-301
The robust multi‑plant capacitated lot‑sizing problem
Aura Jalal, Aldair A. Alvarez, Cesar Alvarez Cruz, Jonathan De La Vega, Alfredo Moreno
págs. 302-330
Obnoxious facility location in multiple dimensional space
Pawel Kalczynski, Atsuo Suzuk, Zvi Drezner
págs. 331-354
Víctor Blanco Izquierdo , Ricardo Gázquez, Marina Leal Palazón
págs. 355-390
A new heuristic for the Euclidean Steiner Tree Problem in ℝn
Renan Vicente Pinto, Nelson Maculan
págs. 391-413
Timetable compression using max‑plus automata applied to large railway networks
Jolien Uyttendaele, Inneke Van Hoeck, Nikola Besinovic, Pieter Vansteenwegen
págs. 414-439
Parallel batching with multi‑size jobs and incompatible job families
Alessandro Druetto, Erica Pastore, Elena Rener
págs. 440-458
págs. 459-474
© 2008-2024 Fundación Dialnet · Todos los derechos reservados